SAS/R Research and Development Facility
Cary, North Carolina
Project Summary:
This is a seven-story cast-in-place concrete facility with a precast and glass window-wall exterior skin. This facility has elaborate electrical systems to include a UPS system. The highlight of this facility is a five-story atrium area with a huge skylight. This facility was completed in 13 months. The Data Base Center encompasses 65,000 sf of communication technology infrastructure.
| Size | 400,000 SF |
|---|---|
| Owner | SAS Institute, Inc |
| SAS Campus Drive | |
| Cary, NC 27513-2414. | |
| Architect | Walter Davis, Architect |
| 503 Oberlin Road, SU300 | |
| Raleigh, NC 27605 |